To prevent installation issues, ensure your workshop meets Nordex’s electrical and connectivity requirements before powering up.
Requirements:
-
Voltage: 400V ±10%, 50Hz, 3-phase
-
Breaker: Dedicated circuit breaker for each CNC unit
-
Grounding: Must meet IEC 60204-1 standards
-
Network: Wired Ethernet, 10 Mbps or higher
-
Firewall: Allow outbound access to api.nordexsystems.com for remote diagnostics
Tip:
Avoid connecting your machine via Wi-Fi or VPN — these can disrupt live telemetry and diagnostic data.
Need documentation?
Ask Nova for the Nordex Installation and IT Setup Guide (PDF).